Sewer inspections precede eventual North Campus renovation
In preparation for the planned North Residential District renovation at Ohio State, maintenance crews are inspecting the sewers.
A maintenance worker prepares a camera robot to inspect the sewers on North Campus.
The sewer shown here is 56 inches wide, with a brick bottom and concrete upper, according to one of the workmen. It was built in 1917.
Maintenance workers inspect the sewer tunnels near Archer House using a robotic camera.